Q&A: I’m Building in Matilda’s Field, do I need to add any of the fibre packages?

Jiawen asks: I’m Building in Matilda’s Field, do I need to add any of the fibre packages?

Our understanding is that there is no fibre being currently run throughout Matilda’s Field but the NBNCo roll out map shows that construction is supposed to commence in this area within 12 months – however it should be noted that NBN is running behind.

For any Porter Davis clients building in areas of this nature, Argus technologies offer a package in preparation for fibre so that the house has the infrastructure required for future connection.

Hope this helps.